Line clearance

Line deflection diagram

Legend

  • Conductor A, tower 1X: -4.40 m, Y: 0.00 m, Z: 28.81 m
  • Conductor A, tower 2X: -4.40 m, Y: 310.00 m, Z: 28.81 m
  • Conductor B, tower 1X: 0.00 m, Y: 0.00 m, Z: 25.00 m
  • Conductor B, tower 2X: 0.00 m, Y: 310.00 m, Z: 25.00 m

Governing minimum clearance — load cases at the sampled curve positions (shortest 3D distance). Cross-wind direction: −1 (right → left, −X)

ConductorLoad caseIce load [N/m]Wind load [N/m]Sag [m]X at span [m]Z at span [m]Tension [MPa]Conductor blow-out [°]Angle chain 1 [°]Angle chain 2 [°]
Conductor A (2)CD (C→D, t≈1.00)19.39010.2669.982-7.38120.002171.72-18.700.000.00
Conductor B (1)AB (A→B, t≈0.00)0.0009.8007.762-4.52114.24947.68-21.62-25.62-24.02